The currently discovered gas (6 discoveries in 6 drills) in the Thrace Basin in Western Turkey has a mid case GIIP of 12.2 bcf. This gives an estimated mid case contingent resource of 8.5 bcf based on a 70% recovery factor.
"The project is proceeding rapidly to commercialisation with Front End Engineering and Design (FEED) study underway. First gas sales are expected mid 2009. Based on production rates of 8-10MMscf/d, it is estimated the cash flow stream net to OEL will be approximately US$5-10 million per year once on production."
It is also worth noting there are still as yet undrilled structures in the licence containing an estimated further GIIP (undiscovered) of 22.4 bcf, or 15.7 bcf based on a 70% recovery factor.
- Forums
- ASX - By Stock
- OEL
- recent article - cautious tone
recent article - cautious tone, page-9
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OEL (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.2¢ |
Change
-0.001(7.69%) |
Mkt cap ! $57.54M |
Open | High | Low | Value | Volume |
1.2¢ | 1.2¢ | 1.2¢ | $4.714K | 392.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 7391126 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 18351847 | 15 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
10 | 7143961 | 0.012 |
9 | 7876361 | 0.011 |
6 | 14157452 | 0.010 |
2 | 1375122 | 0.008 |
2 | 166837 | 0.006 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 15468729 | 13 |
0.014 | 4999235 | 10 |
0.015 | 4127000 | 5 |
0.016 | 2000000 | 1 |
0.017 | 72000 | 1 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
OEL (ASX) Chart |