The company updated well 201 at Cedar Point to Texas Rail late last week and I was following up as no info was supplied re production.
Must have hit a raw f********** nerve
Below is reply to my asking of the most recent re completion as reported to Texas railway without any updated info just the original-if we left these questions till the quarterly then we would still have to ask the same bloody questions
Someone else can deal with this mob to get info-had a gut full of them-obviously Sally has been told to get rid of me.
Read the update sent to Texas Rail and make your own decision
Now for the response to my simple question
'Well No. 201 at Cedar Point is not a dry hole. It is producing from the Miocene sand and is currently producing 162 BOPD and 633 BWPD with a cumulative production of 24 MBO. This well was originally drilled to the Vicksburg sand but was not productive. It was then recompleted to the Frio 1 sand and produced 100% water. After that it was recompleted to the current completion in the Miocene sand.
Apologies for the delay in sending this response. I hope you can appreciate that this level of information does require some effort to obtain, especially as we are dealing with different time zones and that people in the field often must be consulted with. Whilst we have provided this information in this instance, please note it is not always appropriate to quickly turnaround or even provide this level of detail on an ad-hoc basis. I am happy for you to continue to send questions through, but some of these less urgent questions may be better covered off in a quarterly or other disclosure and I would certainly keep a record of items you would be interested in and try my best to see that these are included.'
To read this post, please log in. If you do not have an account, click here to create one. Membership is free.
Link Provided: webapps.rrc.state.tx.us/CMPL/viewPdfReportFormActi...
Add to My Watchlist
What is My Watchlist?