Highlights:
• Production commences at Far West with 9kt of development ore mined
• Quarterly mine production at West 45 reaches all time high of 97kt ore mined
• Record quarterly tonnage of 109kt ore processed through the Thalanga Mill
• Record quarterly concentrate production:− Zinc concentrate produced: +16% from Q2 FY19 to 8,952 tonnes− Lead concentrate produced: +25% from Q2 FY19 to 3,763 tonnes− Copper concentrate produced: +134% from Q2 FY19 to 1,694 tonnes.
- Forums
- ASX - By Stock
- Record production
Highlights:• Production commences at Far West with 9kt of...
-
- There are more pages in this discussion • 34 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)