Pecora, Milling is no trouble if it is all the same, IE just drill pipe. But in this case if they have drill pipe with Cement around it, then they will have to take more time. The steel is hard and the Cement is not as hard, this is all ways a slow job. I think you will find that it will be Cement all the way from here on. If they mill six to ten Meters a day that will be good going. Just now you will have at least twenty rigs world wide doing what GDN is doing now.
GDN Price at posting:
0.0¢ Sentiment: Buy Disclosure: Not Held