Thanks Bonies.
I’m trying to work out what the AISC is per ton of ore (or tailings in this case) because it’s what I’m used to seeing.
Am I right to say they are going to mine and process 12,000,000 tons per annum to produce 500,000 tons of concentrate (so 24x concentration).
AISC of US50c per pound of concentrate = $Us1,000 per ton. This works back to $41/ton of material processed.
At 3.1% head grade, $2,500 Zn and 63% recovery = $48.82. So they make $7/ton. Which is really good if all goes well!
- Forums
- ASX - By Stock
- NCZ
- Recovey
Recovey, page-10
-
- There are more pages in this discussion • 57 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)