The margin here must be razor thin; they’d want to be getting at least 63%. Plant operating costs are typically $12/ton. They lose a further 15% in the TCs. Depending on concentration ratios cash treatment charges per ton of tailings maybe $15. There must be a decent cost for the hydraulic mining pet ton?