Thanks for the compliment Rod.
I honestly think RES are further down the road from a practical point of view, as far as detailed design work and planning are concerned.
The keys, as always, are the rail link, water and an Eskom contract.
I wouldnt be surprised to see Eskom hedge their bets and have the next station supplied by a number of suppliers, paving the way for both RES and FSE to out in 4 or 5 million tons per annum each with maybe SASOL or Anglo.
- Forums
- ASX - By Stock
- recruiting for new power plant
Thanks for the compliment Rod.I honestly think RES are further...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)