I have to agree with Flippa on one point. The refinery as it stands will require major additions and upgrades of existing unit operations to be able to process spent cathodes. The current refinery design won't do this. If it could, all the previous study announcements would have highlighted this as massive future advantage. They did not. I have a sneaky suspicion you know this.
On the autoclaves, my theory is the HPAL peripherals (slurry heaters, flash vessels and interconnecting ducting for example) would logically be upsized from 2.5 Mtpa to suit the maximum processing capacity of the claves they bought. It makes sense to do this now rather than later. However, the upstream and downstream circuits (i.e. the rest of the process plant) will not have been upsized. It would be cost prohibitive in my opinion. So, upsized HPAL? Probably. The rest? No.
- Forums
- ASX - By Stock
- AUZ
- Recycling picking up
Recycling picking up, page-168
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AUZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.2¢ |
Change
-0.001(7.69%) |
Mkt cap ! $16.78M |
Open | High | Low | Value | Volume |
1.2¢ | 1.2¢ | 1.2¢ | $384 | 31.96K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
15 | 35380810 | 1.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.2¢ | 1000000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 35380810 | 0.011 |
9 | 10989476 | 0.010 |
7 | 11055000 | 0.009 |
11 | 7278861 | 0.008 |
9 | 4304286 | 0.007 |
Price($) | Vol. | No. |
---|---|---|
0.012 | 1000000 | 1 |
0.013 | 3044432 | 8 |
0.014 | 3284514 | 11 |
0.015 | 1986028 | 10 |
0.016 | 5713497 | 19 |
Last trade - 10.14am 15/11/2024 (20 minute delay) ? |
Featured News
AUZ (ASX) Chart |
The Watchlist
BTH
BIGTINCAN HOLDINGS LIMITED
David Keane, Co-Founder & CEO
David Keane
Co-Founder & CEO
Previous Video
Next Video
SPONSORED BY The Market Online