Ah k.
that means if they can do 670 000 tons in a month that would put them on target for nameplate. if they have these ships loaded and out by mid next week that will be about 420k+ tons leaving 2.5 weeks to do 250k tons.
Sounds good. if everything is up and running they should be able to do that.