I've posted this in the quarterly thread but feel it would reach more investors on this thread.
Excellent quarterly! Over the duration of the 2024 drilling season, we can look forward to the following;
Sybella - 150 holes plus phase 2 lab results.
Gidyea - 1 hole
Lawn Hills - 1 Hole
Three Ways - 1 Hole (Need confirmation that will be drilled in 2024) Land access preparations for drilling are underway.
Pardoo - 1 hole (Need confirmation that will be drilled in 2024) Land access preparations for drilling are underway.
Yarrie - Up to 8 holes (Need confirmation that will be drilled in 2024) Drill site & access track preparation are on track to begin in Q2.
- Forums
- ASX - By Stock
- RDM
- Red Metal Banter
Red Metal Banter, page-496
- There are more pages in this discussion • 31 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RDM (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $41.93M |
Open | High | Low | Value | Volume |
14.5¢ | 15.0¢ | 14.0¢ | $45.79K | 316.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 29999 | 14.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.0¢ | 197500 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 29999 | 0.140 |
3 | 43203 | 0.135 |
6 | 185369 | 0.130 |
2 | 8007 | 0.125 |
1 | 15000 | 0.120 |
Price($) | Vol. | No. |
---|---|---|
0.160 | 197500 | 3 |
0.165 | 35577 | 2 |
0.170 | 32258 | 1 |
0.175 | 100000 | 1 |
0.180 | 36755 | 1 |
Last trade - 16.10pm 14/06/2024 (20 minute delay) ? |
|
|||||
Last
14.5¢ |
  |
Change
0.000 ( 3.57 %) |
|||
Open | High | Low | Volume | ||
14.5¢ | 15.0¢ | 14.5¢ | 74088 | ||
Last updated 15.41pm 14/06/2024 ? |
Featured News
RDM (ASX) Chart |