Redbank Mines has encountered high-grade copper intercepts during infill drilling being completed at its Redbank deposit in the Redbank oxide copper project, Northern Territory.
Intercepts include 29 m at 7.7 percent copper and 24 m at 4.54 percent copper.
Along with the drilling at the Redbank Deposit, resource infill and definition drilling is also being carried out on the Bluff and Azurite deposits, as part of an expansion definitive feasibility study at the Project.