RHK 8.97% 85.0¢ red hawk mining limited

September quarter will be focussed on: Finalising the approvals...

  1. 1,135 Posts.
    September quarter will be focussed on:

    Finalising the approvals schedule.
    Completing a peer review of the Delta mining studies.
    Finalising the preferred engineering case and commencing engineering and estimating.
    Completing the second phase of fauna, flora and subterranean fauna surveying.
    Further developing the economic model for the project.
    Continuing Phase 2 metallurgical testwork.

    We are currently half way through the September quarter.
 
watchlist Created with Sketch. Add RHK (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.