mallethead:
You directed a post to me:
Trader V
This is a completely senseless pointless post you started and significantly detracts from sensible contributions made by others.
Please take a Bex and have a lie down.
Without checking my first post I remember pointing out what may happen if the plant is delayed or stopped.
It was pointed out to me that it would take LYC 3-4 years to get over the problem (I had suggested 1 year)
I think my post was in line (remember I have invested largly to what I can afford.
My extimations as far as timing was always perfect as an engineer.
I feel the same way as you as for the SP
I think you should appologies, if not I will just not take any notice.
cheers.
- Forums
- ASX - By Stock
- relax if negative we wait 12 for a new plant
mallethead:You directed a post to me:Trader VThis is a...
Featured News
Add LYC (ASX) to my watchlist
(20min delay)
|
|||||
Last
$6.66 |
Change
0.040(0.60%) |
Mkt cap ! $6.225B |
Open | High | Low | Value | Volume |
$6.65 | $6.68 | $6.59 | $40.37M | 6.075M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 97611 | $6.65 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$6.67 | 102267 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 97611 | 6.650 |
2 | 86827 | 6.640 |
11 | 86327 | 6.630 |
1 | 14146 | 6.620 |
3 | 67945 | 6.610 |
Price($) | Vol. | No. |
---|---|---|
6.670 | 2370 | 1 |
6.680 | 41418 | 4 |
6.690 | 17146 | 2 |
6.700 | 14146 | 1 |
6.710 | 2500 | 1 |
Last trade - 16.10pm 31/05/2024 (20 minute delay) ? |
|
|||||
Last
$6.63 |
  |
Change
0.040 ( 0.25 %) |
|||
Open | High | Low | Volume | ||
$6.63 | $6.68 | $6.59 | 6537259 | ||
Last updated 15.59pm 31/05/2024 ? |
Featured News
LYC (ASX) Chart |