I thought the initial production run had to be done at a maximum production rate for CE approval. Subsequent runs can be at lower rates which can match production costs with sales.
Week 44 Wrap: Relatively boring week ahead of US election; HotCopper's most watched; Oz inflation at 3.5%
MKT The ASX can overlook its Telecomm small-caps. Here’s one diversified brand with an international footprint