MAY 3.77% 5.1¢ melbana energy limited

Released News: Cuba Block 9 Operations Update, page-291

  1. 1,240 Posts.
    lightbulb Created with Sketch. 211

    Cuba Block 9: Alameda-3 Drilling Update

    Highlights

    • Well at 2710mMD and drilling ahead to section TD (2869mMD).
    • At TD, set 9-5/8” casing and drill ahead to section and well TD (3835mMD).
    • Subsurface formations being encountered as per prognosis (+/- 5m).

 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
5.1¢
Change
-0.002(3.77%)
Mkt cap ! $171.8M
Open High Low Value Volume
5.3¢ 5.3¢ 5.1¢ $132.0K 2.561M

Buyers (Bids)

No. Vol. Price($)
7 1417292 5.1¢
 

Sellers (Offers)

Price($) Vol. No.
5.2¢ 387368 3
View Market Depth
Last trade - 16.10pm 27/05/2024 (20 minute delay) ?
Last
5.1¢
  Change
-0.002 ( 1.92 %)
Open High Low Volume
5.2¢ 5.2¢ 5.1¢ 2008830
Last updated 15.41pm 27/05/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.