OZL 0.00% $26.44 oz minerals limited

relentless selling, page-63

  1. 138 Posts.
    Hi Redgum, It was my mistake in the
    first place. I should have said decline rather than
    declined.

    I would prefer to see a long sloping decline rather than a
    vertical shaft. A decline would cost significantly more but facilitate the entry of large equipment and immediate bulk
    sampling. It also constitutes 'early' access for the
    removal of ore.

    Contrary to 'normal procedure' I would also like to see
    the mine development shafts occur within the ore body. The idea is to truck some ore to PH and get some early income.
    Early income will reduce the cost of mine development and have a positive affect by reducing the cost of mine development. Even small amounts of 'development ore' would be appreciated. HC42
 
watchlist Created with Sketch. Add OZL (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.