Sounds like the topic of power supply is still very much up in the air.
So, the Lake DFS is dependent on Distrocuyo to complete their feasibility study first.
Then drawing up an agreement between potentially 3 parties to split the costs along with max drawdowns by each (messy).
Then that’s only Phase 1, what happens for Phase 2?
Then there’s solar, how much vs how little, what’s the back-up contingency?
Then there’s the time factor, if this all goes ahead how long will a 3rd party take on their end?
IMO it’s a headache.
- Forums
- ASX - By Stock
- LKE
- Relevant Excerpts from Lake Update Webinars
Relevant Excerpts from Lake Update Webinars, page-4
- There are more pages in this discussion • 440 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LKE (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.6¢ |
Change
0.003(4.76%) |
Mkt cap ! $109.5M |
Open | High | Low | Value | Volume |
6.2¢ | 6.6¢ | 6.2¢ | $436.6K | 6.779M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 238075 | 6.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.6¢ | 136219 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 238075 | 0.064 |
7 | 648172 | 0.063 |
4 | 807479 | 0.062 |
14 | 1134334 | 0.061 |
23 | 1668364 | 0.060 |
Price($) | Vol. | No. |
---|---|---|
0.066 | 136219 | 4 |
0.067 | 729775 | 9 |
0.068 | 1701280 | 13 |
0.069 | 719189 | 8 |
0.070 | 1125576 | 16 |
Last trade - 16.10pm 14/05/2024 (20 minute delay) ? |
|
|||||
Last
6.6¢ |
  |
Change
0.003 ( 7.67 %) |
|||
Open | High | Low | Volume | ||
6.2¢ | 6.6¢ | 6.2¢ | 1844093 | ||
Last updated 15.59pm 14/05/2024 ? |
Featured News
LKE (ASX) Chart |