Hope after the carve up you guys will get a peice of the pie.
page 17
http://www.asx.com.au/asxpdf/20150716/pdf/42zvr4s43jmxnr.pdf
The initial focus will be the development of the Browns Oxide deposit by way of a heap leach operation to recover copper in the form of copper sulphate crystals. In Stage One of the development the Company will undertake an Optimisation Study to establish the full feasibility of proceeding with such project which is expected to be completed in the first quarter of 2016. In the event the Study is positive, it is expected the Company
will commence development of the heap leach project in the first quarter of 2016 and be in production by the end of the second quarter of 2016. o
In parallel with the development of the heap leach, the Company will continue to explore the development of the Sulphide Deposit at Browns centred on the Scoping Study referred to above.
http://www.asx.com.au/asxpdf/20150716/pdf/42zvqzg5cppj48.pdf
page 7
- Forums
- ASX - By Stock
- CMR
- Relisting
Relisting, page-5
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CMR (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online