RLT 3.43% 84.5¢ renergen limited

Renergen General Discussion, page-3127

  1. 2,403 Posts.
    lightbulb Created with Sketch. 459
    The OEM contractor must now demonstrate that they are operating the entire plant at desired temperature, pressure, and production flow parameters before the Contractor is allowed to commence final contractual obligation of completing a Performance Test. The Performance Test is envisioned to run over a period of seven days

    Ok Stef tell your investors what is the excuse ?
 
watchlist Created with Sketch. Add RLT (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.