    Thanks for the 16 days, Guts !

    My rough calculation ended up with 17.5 days for a filling at nameplate capacity. Took a 40“ container, layed a circle with d= min of hight and width inside, d multiplied with 0.7 to take the nitrogen filled double wall into account, and multiplied with length. A bit rough, so good to see your math : - )

    Did you have precise info of capacity (volume or weight)?
    Stated tara on the container was not helpful, too high.

    Besides that I would not be worried if it takes some days more, I don‘t think that we are at nameplate capacity already.

    glta,
    sd
 