RLT 1.12% 88.5¢ renergen limited

Renergen General Discussion, page-818

  1. 4,108 Posts.
    lightbulb Created with Sketch. 958
    The OPIC/DFC loan had a 3 year grace period which would of just finished. The Phase One plant was expected to be operational by now and ideally it would of been operating back in late 2021 as previously scheduled so Renergen could of built up a buffer of cash through the remainder of the grace period. Instead unfortunately there have been delays due to covid etc..

    Lessons learnt hopefully for Phase Two to be done in a timely manner.



    https://hotcopper.com.au/data/attachments/4863/4863563-8ce78d96acfbbc57e4e7fa35a95863f0.jpg

    https://hotcopper.com.au/data/attachments/4863/4863566-2247d0f365f55a1b89a5c63f0054d601.jpg



 
watchlist Created with Sketch. Add RLT (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.