Share
25,363 Posts.
lightbulb Created with Sketch. 29
clock Created with Sketch.
20/01/20
13:27
Share
Originally posted by benson1610
↑
I/m not going to google it again but i believe there are renewables plants in n/e nsw that are being delayed from connecting to the grid.
This issue is 'battery' storage nothing else.
And as posted many times renewables is all about battery storage ie life span 10 to 15 years ,toxic and currently basically non recyclable.
Same this ridiculous state govt including victoria and the mass roll out of roof top solar.
As AEMO said its a threat to the grid as its electricity flow into the grid is uncontrlled.ie day plenty of electicity night non.So again it requires bettery storage and all the issues that come with battery storage including the lithium mines.
The renewables sector must start referring to renewables for what it is 'battery storage' not la la solar and wind clean energy.
ps not to mention the issues with solar and wing including panel and turbine lifespan,recycling ,bird kiiling wind turbines and the sf6 gas ,worst gas to humans for climate warming but required to cool turbines but it leaks.
The roll out of renewables reminds me of pink batts policy.
Expand
The crazy thing is that billions of dollar have been spent and there was never a cost benefit plan ever even proposed let alone done, just a case of a bit of fear spread and bang, straight into it at full speed
If in twenty years time they do a RC into the waste and lack of electric power will the investigators, bureaucrats and politicians be sent to jail ???