ARL 2.33% 44.0¢ ardea resources limited

Reply from Dr Matthew Painter re the PFS, page-3

  1. 3,329 Posts.
    lightbulb Created with Sketch. 1886
    Please do not take things in isolation, it states clearly PRODUCTION COST

    The C1 cost breakdown shown in Table 1-1 is first by nickel costs, then subtracting the cobalt credits for an overall ​
    C1
    of US$0.42 per pound of contained metal produced for the entire operation at 1.0 Mtpa
    . As nickel sulphate contains 22.3% nickel metal, and cobalt sulphate contains 20.5% cobalt sulphate, we’ll be producing around 4.5 to 5 times the amount of sulphates for that 42 cents. So the calculations for each per pound of sulphate are as follows:​

    • Nickel: US$0.42 x 0.223 = US$0.09 or 9 cents per pound of nickel sulphate
    • Cobalt: US$0.42 x 0.205 = US$0.08 or around 8.5 cents per pound of cobalt sulphate
 
watchlist Created with Sketch. Add ARL (ASX) to my watchlist
(20min delay)
Last
44.0¢
Change
0.010(2.33%)
Mkt cap ! $87.86M
Open High Low Value Volume
46.0¢ 46.5¢ 44.0¢ $49.91K 109.8K

Buyers (Bids)

No. Vol. Price($)
1 18106 44.0¢
 

Sellers (Offers)

Price($) Vol. No.
45.5¢ 2775 2
View Market Depth
Last trade - 15.59pm 02/09/2024 (20 minute delay) ?
ARL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.