Apparently Jet 3 is looking like 2 weeks ahead of schedule which is going to save us big bucks on drill costs!
Also Rocket 2 confirms that if the 5000 foot lateral had of been drilled, then 15mmcfd may have been possible. I.E a third was driulled, and a third flow rate flowed!
Post Jet 3 these re-entry jobs to perforate and produce oil are going to be worked up I`m told.
- Forums
- ASX - By Stock
- BUR
- rerating occurring. this is going back to 30c
rerating occurring. this is going back to 30c, page-2
Featured News
Add BUR (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.5¢ |
Change
-0.003(4.41%) |
Mkt cap ! $9.774M |
Open | High | Low | Value | Volume |
6.5¢ | 6.5¢ | 6.2¢ | $4.78K | 75.46K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 301 | 6.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.7¢ | 250000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 301 | 0.065 |
1 | 26124 | 0.062 |
1 | 16393 | 0.061 |
2 | 60000 | 0.060 |
1 | 100000 | 0.055 |
Price($) | Vol. | No. |
---|---|---|
0.067 | 250000 | 1 |
0.068 | 60596 | 2 |
0.073 | 38000 | 1 |
0.085 | 50000 | 1 |
0.090 | 100000 | 1 |
Last trade - 13.39pm 19/11/2024 (20 minute delay) ? |
Featured News
BUR (ASX) Chart |