The 20% P2O5 is not a problem. Most phosphate deposits require simple screen and wash to bring it up to commercial grade. Should come out at around A$3/ton for beneficiation.
The only issue is strip ratio which AD has not addressed.
"which is closer to surface"
It's a case of relativity, so how close to the surface?
A simple cross section, possibly a fence diagram would suffice.
Anyway, nice tonnage, excellent grades and close proximity to the Barkley highway. Only need a favourable strip ratio and Andrew has the complete package.
- Forums
- ASX - By Stock
- resource estimate for arruwurra deposit
The 20% P2O5 is not a problem. Most phosphate deposits require...
-
- There are more pages in this discussion • 39 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AEV (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
-0.001(20.0%) |
Mkt cap ! $9.396M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.4¢ | $15 | 3.701K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 6807834 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 8690207 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 6807834 | 0.004 |
10 | 6573337 | 0.003 |
6 | 4425000 | 0.002 |
6 | 10199950 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 8690207 | 10 |
0.007 | 6580665 | 10 |
0.008 | 6588125 | 8 |
0.009 | 386000 | 2 |
0.010 | 1321252 | 4 |
Last trade - 16.10pm 27/06/2024 (20 minute delay) ? |
Featured News
AEV (ASX) Chart |