Kyushu Electric Power : finishes loading fuel into nuclear reactor
07/09/2015 | 05:23pm US/Eastern
Kyushu Electric Power Co. has completed reloading nuclear fuel into a reactor at its Sendai Nuclear Power Station, a step toward rebooting the first atomic device meeting stringent safety standards Japan has introduced after the 2011 Fukushima meltdowns.
The last rod assembly -- the 157th -- was embedded into the reactor at12:12 a.m. Friday, ending an operation that engaged some 50 workers around the clock since the loading process started Tuesday at the station in Kagoshima Prefecture, a company official said.
Subject to inspection clearance by the government's Nuclear Regulation Authority in the coming days, Kyushu Electric is envisaging firing up the reactor around Aug. 10 to start trial power transmission three days later.
The reactor is expected to be geared up to full steam later in the month before starting commercial power transmission in September, a move that would likely bring relief to the company, which has been reeling from losses caused by hefty fossil fuel costs to run conventional power plants with all its six nuclear reactors grounded.
The resumption of the reactor -- one of the two at the Sendai plant -- will mark the restart of nuclear power generation in Japan which has been at a standstill due to safety concerns following the disaster at the Fukushima nuclear power plant caused by a massive earthquake and tsunami. None of Japan's commercial reactors has been online for nearly two years.
If the nuclear authority finds any problem, Kyushu Electric will be required to address it and this may result in the restart being delayed.
The utility is aiming to reload fuel into the second reactor at the Sendaiplant in early September and reboot it in mid-October.
==Kyodo
© Kyodo News International, Inc., source Newswire
http://www.4-traders.com/KYUSHU-ELE...s-loading-fuel-into-nuclear-reactor-20669496/
- Forums
- ASX - By Stock
- Restart imminent - Kyushu Electric Power : finishes loading fuel into nuclear reactor
Kyushu Electric Power : finishes loading fuel into nuclear...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PEN (ASX) to my watchlist
|
|||||
Last
10.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $318.4M |
Open | High | Low | Value | Volume |
10.5¢ | 10.5¢ | 10.0¢ | $618.1K | 6.070M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
78 | 8125819 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 4932141 | 36 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
78 | 8125819 | 0.100 |
6 | 712626 | 0.099 |
12 | 397940 | 0.098 |
9 | 882388 | 0.097 |
12 | 2690590 | 0.096 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 4932141 | 36 |
0.110 | 2964212 | 32 |
0.115 | 4229236 | 24 |
0.120 | 5904237 | 56 |
0.125 | 2128840 | 21 |
Last trade - 16.10pm 03/07/2024 (20 minute delay) ? |
Featured News
PEN (ASX) Chart |
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO & MD
Anthony Noble
CEO & MD
Previous Video
Next Video
SPONSORED BY The Market Online