Sendai Nuclear Plant Continues Preparation For Restart
Staffs of the Kyushu Electric Power Co's Sendai Nuclear Power Plant check the procedures ahead of the reactor restart at a mock control room on July 14, 2015 in Satsumasendai, Kagoshima, Japan. Kyushu Electric is currently undergoing the final procedures toward the restart of the reactor under the new safety standards of the Nuclear Regulation Authority. The utility began loading nuclear fuel into the No. 1 reactor on July 7. Kyushu Electric will continue to have NRA inspections of equipment related to the reactor. It will also hold a four-day safety drill from July 27 that will replicate conditions of a severe accident at the plant.
- The Asahi Shimbun
- Forums
- ASX - By Stock
- Restart imminent - Kyushu Electric Power : finishes loading fuel into nuclear reactor
[IMG] Sendai Nuclear Plant Continues Preparation For Restart The...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PEN (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $305.9M |
Open | High | Low | Value | Volume |
9.6¢ | 10.5¢ | 9.1¢ | $2.766M | 27.91M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 317999 | 9.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.8¢ | 180000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 317999 | 0.096 |
2 | 400000 | 0.095 |
2 | 110989 | 0.091 |
8 | 1188742 | 0.090 |
3 | 71235 | 0.089 |
Price($) | Vol. | No. |
---|---|---|
0.098 | 180000 | 1 |
0.099 | 300000 | 1 |
0.100 | 293948 | 4 |
0.105 | 4452526 | 36 |
0.110 | 4053261 | 39 |
Last trade - 16.10pm 02/10/2024 (20 minute delay) ? |
Featured News
PEN (ASX) Chart |