PEN 0.00% 10.0¢ peninsula energy limited

[IMG] Sendai Nuclear Plant Continues Preparation For Restart The...

  1. jzm
    732 Posts.

    Sendai Nuclear Plant Continues Preparation For Restart

    • The Asahi Shimbun
    Staffs of the Kyushu Electric Power Co's Sendai Nuclear Power Plant check the procedures ahead of the reactor restart at a mock control room on July 14, 2015 in Satsumasendai, Kagoshima, Japan. Kyushu Electric is currently undergoing the final procedures toward the restart of the reactor under the new safety standards of the Nuclear Regulation Authority. The utility began loading nuclear fuel into the No. 1 reactor on July 7. Kyushu Electric will continue to have NRA inspections of equipment related to the reactor. It will also hold a four-day safety drill from July 27 that will replicate conditions of a severe accident at the plant.
 
watchlist Created with Sketch. Add PEN (ASX) to my watchlist
(20min delay)
Last
10.0¢
Change
0.000(0.00%)
Mkt cap ! $318.4M
Open High Low Value Volume
10.5¢ 10.5¢ 10.0¢ $618.1K 6.070M

Buyers (Bids)

No. Vol. Price($)
78 8125819 10.0¢
 

Sellers (Offers)

Price($) Vol. No.
10.5¢ 4932141 36
View Market Depth
Last trade - 16.10pm 03/07/2024 (20 minute delay) ?
PEN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.