Connecting the dots of those drill holes that AZS displayed with grades in that figure. (means nothing of course)
I think that road cuttings result has confirmed to them that the area has high-grade patches not captured in those holes previously drilled. Strangely enough, I thought some trenching first to help identify the higher grade areas would have been done first. Obviously keen to start drilling.
Sounds like only 1 or 2 drill rigs will be used. Targeting only the first 100-150m from the surface. 7000m drill program means approximately 46 holes @ 150m depth depending on what they see in the drill cores.
AZS Price at posting:
13.5¢ Sentiment: Buy Disclosure: Held