    Tritton Deposit
    • Drilling from underground at Tritton returns a highly significant intercept of:
    o 4.45 m @ 32.2 % Cu, 287 g/t Ag and 1.1 g/t Au in TRGC 033 as seen in the
    photo below
    This is one of the highest grades returned from any drill hole at Tritton and is
    indicative of the exploration potential in the area immediately surrounding the
    mine workings
    North East Deposit
    • Drilling from surface at North East continues to return positive results including:
    o 10 m @ 2.7 % Cu in NEDT 008 from 228 m
    o 4.8 m @ 2.1 % Cu in NEDT 006 from 193.2 m
    Drilling Results
    Tritton Deposit
    Diamond drilling from underground at Tritton has intersected some of the highest grade
    mineralisation seen to date in the Tritton deposit. Drill hole TRGC 033 was drilled to test an
    area at the top of the current reserves (refer to attached cross section).
    This hole returned an outstanding 4.45 m (estimated true width) @ 32.2 % Cu, 287 g/t Ag and
    1.1 g/t Au.
    This hole was drilled to test for extensions of high grade mineralisation located in drill holes by
    a previous owner (BDS 048 - 12 m @ 21 % Cu, 179 g/t Ag and 1.6 g/t Au and BDS 054 – 8 m @
    19.4 % Cu, 80 g/t Ag and 0.45 g/t Au). These grades are significantly higher than the reserve
    grade of approximately 5 % Cu incorporated in the current plan for this area of the mine.
    The high grade mineralisation in this area was previously interpreted to be small pods hosted
    within the main Tritton deposit. Mining of these areas on the 5032 level and infill drilling with
    holes such as TRGC 033 indicate that these high grade zones are steeply dipping (sub
    vertical) distinct shoots of bornite rich sulphides that extend for at least 20 m above the main
    flatter dipping ore body.
    The very high grade nature of this mineralisation makes it a very attractive exploration target
    and drilling of this shoot is continuing. There is very little drilling in the footwall of the main
    Tritton deposit and it is not known if these shoots extend into the footwall or not.
    North East
    The North East prospect is located 25 km north of the Tritton processing plant on a mining
    lease and freehold land owned by the Company. Drilling of the down plunge extension of
    the copper mineralisation below the open pit has identified a mineralised shoot up to 150 m
    in strike length and to a depth of 125 m below the pit floor.
    I
    nitial drilling by Tritton in this area returned interesting but sub economic grade mineralisation
    immediately below the pit floor. A review of the drill data at the end of 2004 indicated that
    this drilling may not have accurately targeted the main shoot and that there is a low grade
    depletion zone immediately below the pit floor.
    Follow up drilling in 2005 has been successful in locating higher grade copper mineralisation
    at depth, with the most recent results including:
    o 10 m @ 2.7 % Cu in NEDT 008 from 228 m, hosted within a broader envelope
    grading 17 m @ 2.0 % Cu
    o 4.8 m @ 2.1 % Cu in NEDT 006 from 193.2, hosted within a broader envelope
    grading 13.3m @ 1.4 % Cu
    The location of these drill holes is shown in the long section attached below. NEDT 008 is
    located approximately 50 m away from the previously released NEDT 007 (10 m @ 4.0 % Cu),
    confirming the mineralisation model of higher grades on the footwall contact. These grades
    and widths of mineralisation are highly encouraging and confirm North East as the second
    highest priority target (after the high grade shoots underground at Tritton) in the current
    exploration program.
    Drilling is ongoing on a 50 m x 50 m pattern and results will be released as they are available.
    Visit our website at www.trittonresources.com.au where further information about the
    Company can be found.
    For and on behalf of the Board
    Ian Culbert
    Managing Director
    This report, so far as it pertains to ore and mineralisation, is based on information compiled and as reported by
    Mr. Mick McMullen, Technical Director, Tritton Resources Limited, who is a Member of the Australasian
    Institute of Mining and Metallurgy and has at least five years of relevant experience in the field of activity
    concerned
 
watchlist Created with Sketch. Add TTT (ASX) to my watchlist
(20min delay)
Last
15.5¢
Change
0.010(6.90%)
Mkt cap ! $156.7M
Open High Low Value Volume
15.5¢ 16.3¢ 15.0¢ $575.4K 3.717M

Buyers (Bids)

No. Vol. Price($)
13 162129 14.5¢
 

Sellers (Offers)

Price($) Vol. No.
15.5¢ 14075 2
View Market Depth
Last trade - 16.10pm 30/07/2024 (20 minute delay) ?