No metion at te AGM but this article from July suggests that following the VTEM survey they will look to do "on-ground trenching and sampling then drilling later in the year".
"later in the year" did refer to the end of 2013 but given they hoped to commence the VTEM survey in July (which has obviously been delayed) I would assume a similar timeframe from the onset of the survey.