FAR 0.00% 49.0¢ far limited

results, page-31

  1. 16,272 Posts.
    lightbulb Created with Sketch. 3821
    Ele by my calcs its 3 weeks earlier than Athena did SNE 3 testing and the top hole had been completed there!
    I think you may find that drilling is even cheaper than we suspect and might squeeze in 3 for the price of 2. Based on the drill time it will be done easily in the 120 days I was thinking. DB
 
watchlist Created with Sketch. Add FAR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.