Have Carnegie ever announced as below that it would be installed...

  1. 2,444 Posts.
    lightbulb Created with Sketch. 27
    Have Carnegie ever announced as below that it would be installed July 11 and that the French govt would be kicking in 5 million of the 9 million required for the demo unit?

    ____________________________________________________________

    Owner, developer and operator: Carnegie Wave Energy Limited and EDF Energies Nouvelles

    Planned total generating capacity: 15 MW
    The R?union Island CETO Power Project will initially consist of the deployment of a single, autonomous CETO unit by 30 June 2011, which will be followed a 2 MW plant and a further expansion of the project to a nominal 15 MW.

    Location: La R?union Island (department of France), 200 km southwest of Mauritius

    Demographic: Rural

    Status: Under construction

    Capital cost: Stage 1 (single unit operation): $A9 million, $A5 million French Government grants, $A2 million EDF EN, $A2 million Carnegie Wave Energy

    Construction contractor: DCNS (Direction des Constructions Navales)

    Fuel source: Wave energy




 