LLL 0.00% 50.5¢ leo lithium limited

both, calcs based on Stage 1: 472,000 tpa, Stage 2: 800,000 tpa,...

  1. 484 Posts.
    lightbulb Created with Sketch. 50




    both, calcs based on Stage 1: 472,000 tpa, Stage 2: 800,000 tpa,
    also, assume a mining inventory of 72Mt vs Resource/Reserves of 108Mt (60%M+I)/52Mt and Stage 1/2 throughput of 2.3Mtpa/4Mtpa respectively.

    refer below for more details

    https://hotcopper.com.au/data/attachments/4597/4597290-31ae6fd3d1b9734bd25db70cc55d0089.jpg
 
watchlist Created with Sketch. Add LLL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.