Just visiting the indonesian SKKMIGAS site, and it looks like a pre-qualification request has been distributed to shoot the 3D seismic, including processing. This is to close on Thursday, after which tendering will occur.
Looks like we are on track to run the seismic over the 500Km2 area within the Tanjung aru block during CYQ4. Krisenergy are driving this. Makes sense as they are already engaged in the region, and have successfully appraised lengo (Java), and Tayum (Kalimantan).
NEN Price at posting:
30.0¢ Sentiment: Buy Disclosure: Held