Just visiting the indonesian SKKMIGAS site, and it looks like a pre-qualification request has been distributed to shoot the 3D seismic, including processing. This is to close on Thursday, after which tendering will occur.
Looks like we are on track to run the seismic over the 500Km2 area within the Tanjung aru block during CYQ4. Krisenergy are driving this. Makes sense as they are already engaged in the region, and have successfully appraised lengo (Java), and Tayum (Kalimantan).
- Forums
- ASX - By Stock
- NEN
- rfp out for indonesia
rfp out for indonesia
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
HCH
Hot Chili sets up water company as drought racks Chile–but must also build communities a desal plant
CXO
Core Lithium narrowly beats guidance on FY24 spodumene production but 1Y returns still shattered