CTP 0.00% 5.3¢ central petroleum limited

Click1 - You are correct, however an EPT requires shut in...

  1. 497 Posts.
    Click1 - You are correct, however an EPT requires shut in periods to examine pressure build up and other technical issues that are all part of the testing regime , and that affects overall producion levels.

    At the start of the EPT the company ann. that initial testing production would be around 100 - 250 BOPD (from memory).

    The true production levels will have to wait a few months in all probability, as they have to carefully test to the eventual level without damaging the reservoir.

 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
5.3¢
Change
0.000(0.00%)
Mkt cap ! $39.22M
Open High Low Value Volume
5.3¢ 5.4¢ 5.3¢ $52.12K 978.8K

Buyers (Bids)

No. Vol. Price($)
1 454057 5.3¢
 

Sellers (Offers)

Price($) Vol. No.
5.4¢ 46397 1
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.