88E 0.00% 0.2¢ 88 energy limited

Rig move starts 15th Feb to Charlie-1 location

  1. 177 Posts.
    lightbulb Created with Sketch. 144
    Rig move to drilling site confirmed to commence on 15th Feb.

    https://aktrucks.org/info-for-haul-rd-group-dalton-drill-rig-move/

    Info for Haul Rd Group – Dalton Drill Rig Move*** Early Notice – Permits Still in Process ***Starting Saturday, Feb. 15, at 12 a.m., Accumulate Energy Alaska, Inc., in partnership with Cruz Construction and Nordic, will begin moving a large drill rig on the Dalton Highway from Deadhorse to mile 386. The move is anticipated to last through Monday, Feb. 17, at 12 p.m.Traffic will not be able to pass the drill rig during the move. The rig is large enough that it requires both lanes of the highway to travel and it will be traveling at low speeds. Drivers should anticipate lengthy delays.Road closures will be established during the move to control traffic. Over the three day move, the drill rig will pull into pullouts in three locations and waiting traffic will be permitted to travel through. These are the locations and anticipated times:
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $57.78M
Open High Low Value Volume
0.3¢ 0.3¢ 0.2¢ $47.01K 19.31M

Buyers (Bids)

No. Vol. Price($)
100 154911817 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 551974746 164
View Market Depth
Last trade - 16.10pm 09/07/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.