Well CV, I think Farjock covered the some possibilities in recent posts, but if my memory serves me correctly Cairn did say they planned extensive testing on this well. Potentially there are a number of different sands to be tested - the "mid" thin sands tested at SNE2, the upper thin sands (on which I have previously posted I had high hopes) and maybe a "dipping" 480 gas sand. These latter two would not have been available for testing at SNE2.
That's all assuming there is no possibility of any of the upper blocky sand extending to the SNE3 location.
pj
- Forums
- ASX - By Stock
- FAR
- Rig Move
Rig Move, page-42
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
GML
Gateway Mining sells WA Eastern Montague gold project to Brightstar for $14M – half of that in shares
Add FAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
50.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $46.66M |
Open | High | Low | Value | Volume |
51.5¢ | 51.5¢ | 50.5¢ | $97.33K | 190.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 26752 | 50.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
52.0¢ | 109917 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 42668 | 0.500 |
2 | 29755 | 0.485 |
4 | 113930 | 0.480 |
2 | 70000 | 0.475 |
2 | 78150 | 0.470 |
Price($) | Vol. | No. |
---|---|---|
0.520 | 109917 | 4 |
0.525 | 60000 | 2 |
0.530 | 60000 | 2 |
0.535 | 115000 | 3 |
0.540 | 131187 | 5 |
Last trade - 15.45pm 02/08/2024 (20 minute delay) ? |
Featured News
FAR (ASX) Chart |