ozblue
Your comments mate "60,000t/a is not out of the question"
OK mate now lets do the numbers.
We don't know the actual production number so lets use the 3 million tons per annum.
3 mt/a with output of 60 000 tonnes gives a grade of 2%
What was that word you used was it high grade. The JORC is 1.7% and that is for the entire 30 000 tons before any of the last 2.5 years of drilling
Most on here are expecting first year at somewhere between 3 and 6% with 4 being possible.
You are claiming a 1 per share
The costs are much the same irrespective of grade so if you are including costs in your 1 number then anything above that is pure profit. At double your grade with costs removed well do your homework.
- Forums
- ASX - By Stock
- CDU
- rights issue - 3 options
rights issue - 3 options, page-25
-
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CDU (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online