ADY admiralty resources nl.

rincon update

  1. 5,231 Posts.
    Highlights
    • 12 tonnes of 97% pure lithium carbonate produced YTD
    • Next stage of pilot plant will produce 30 tonnes per month of 99.0+%
    Li2CO3, targetted completion by November 2008
    • 10,000 tonnes of sodium sulphate produced from Rio Grande – 12 staff
    operating facility
    • Potash purification facility to be installed soon
    The Board of Directors are delighted to report that progress at the Rincon Salar is
    progressing well. We have experienced very favourable evaporation conditions during
    the summer and our improved production process is now consistently producing high
    recoveries of lithium. The mass balance results have been outstanding in terms of
    minimal loss of lithium as the brine moves through the production process.
    The Rincon team under the leadership of Drs Sorentino, Galli and Alonso have been
    able to produce 12 tonnes of lithium carbonate using our new production process and
    chemicals that we have produced ourselves. The lithium carbonate will be further
    purified to 99.0+% when additional equipment is installed which among other things
    produces sodium hydroxide.
    Production of Potash will commence when the necessary equipment is installed to
    bring it up to 99.75% purity. The focus to date has been on lithium carbonate
    production but potash will commence soon.
    We have acquired an R-C drill which we are sending to Argentina to assist our
    geological team with further work on our new lithium prospect and also in their search
    for potash deposits to supplement production from Rincon.
    Rio Grande
    The Rio Grande mine is fully operational producing 10,000 tonnes of sodium sulphate
    to date. This has already created savings of more than US$1.3million ($190 vs $60 per
    tonne) to date compared to buying finished product. We need approximately 110,000
    tonnes of sodium sulphate to produce 17,000 tonnes of lithium product. Rincon’s
    strategy is to produce all our own input materials to keep our production costs as low
    as possible. We now have all these in place.
    We have a team of twelve working at the Rio Grande and shortly we will be completing
    construction of permanent offices and a geological office facility.
    17025 and ISO9000 Certification
    The laboratory had its audit for this standard and met 99% of the requirements
    enabling it to certify the quality of our lithium, potash and other products when
    commercial production commences. Minor changes to the documentation have to be
    made, but the audit team were impressed with our procedures and process.
    A new laboratory will be located adjacent to a planned 1,600 sq metre warehouse
    facility we are building near the township of Jujuy.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
0.6¢
Change
0.000(0.00%)
Mkt cap ! $15.77M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
2 1917765 0.6¢
 

Sellers (Offers)

Price($) Vol. No.
0.7¢ 4242345 2
View Market Depth
Last trade - 09.59am 19/09/2025 (20 minute delay) ?
ADY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.