FMG 0.00% $20.35 fortescue ltd

rio have premium grade io deposit in guinea

  1. DSD
    15,757 Posts.
    This deposit is very rich Hematite with grade cut-off at an incredible 66%!! Rio plans to start with 70m tons/annum.
    World over-production of IO is only 18 months away.

    29 May 2008

    Rio Tinto reports 2.25 billion tonnes of iron ore resources at its Simandou project in the Republic of Guinea

    Significant exploration and resource definition work undertaken over a number of years on the Simandou Mining Concession granted to Rio Tinto in March 2006 has led to the discovery and definition of JORC compliant resources. These resources are located within the Pic de Fon and Oueleba deposits which form part of the Simandou range in south eastern Guinea.

    The chief executive of Rio Tinto Iron Ore, Sam Walsh, said: "Simandou in Guinea represents a major new iron ore province. Its strategic location gives us access to the Atlantic basin and the fast growing Middle Eastern market. We are planning the development of our first production phase of 70 million tonnes per annum, potentially rising to 170 million tonnes per annum, subject to agreement with the government of Guinea. We believe this area represents one of the best undeveloped major deposits of premium-grade iron ore in the world."


    Geology of Pic de Fon and Oueleba
    The Simandou range consists of a sequence of deformed itabirites, phyllites and quartzites within Proterozoic basement rocks. At Pic de Fon and Oueleba, the itabirites have been enriched to form hematite and hematite-goethite mineralisation.

    Both the Pic de Fon and Oueleba deposits are approximately 7.5 km in length and up to 1km wide. The two deposits are separated by approximately 4 km in a north south direction along the Simandou range.

    Rio Tinto has drilled over 500 reverse circulation and diamond drill holes (approximately 93,000m) at Pic de Fon and Oueleba. Very high-grade iron ore mineralisation has been intersected to over 300m depth at both deposits.

    Mineral Resources

    The tabulated resources are split into the two deposits and are considered extractable using currently available standard mining and processing technologies. All resources are reported on an in-situ dry tonnes and grades basis.

    Pic de Fon Mineral Resources (for Fe >62%):

    Resource Category Tonnes (Mt) Fe %
    Indicated 320 67.2%
    Inferred 252 66.2%
    Total 572 66.8%


    Oueleba Mineral Resources (for Fe >62%):

    Resource Category Tonnes (Mt) Fe%
    Indicated 980 65.6%
    Inferred 703 65.8%
    Total 1,682 65.7%


    Approximately 30 per cent of the Inferred resources reported above are extrapolated outside of the current drilling coverage.

    Future Direction
    Rio Tinto's evaluation work is continuing at both deposits as part of a Pre-Feasibility study to further improve the confidence in the known resources and for definition of additional resources. The pre-feasibility study is also evaluating rail and port infrastructure and completing environmental and social studies.

    In addition, Rio Tinto is aggressively exploring the remaining parts of the 738km2 Simandou Mining Concession for further resources as part of an agreed programme with the Government of Guinea.

 
watchlist Created with Sketch. Add FMG (ASX) to my watchlist
(20min delay)
Last
$20.35
Change
0.000(0.00%)
Mkt cap ! $62.65B
Open High Low Value Volume
$20.47 $20.68 $20.28 $96.30M 4.714M

Buyers (Bids)

No. Vol. Price($)
1 50 $20.34
 

Sellers (Offers)

Price($) Vol. No.
$20.35 20500 1
View Market Depth
Last trade - 16.10pm 29/07/2024 (20 minute delay) ?
FMG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.