Bonanza Gold Run at Cascavel Continues etc....
''Drilling to-date indicates the gold mineralisation may widen at depth.
When the Cascavel mine was initially commissioned in 2016, it failed to recover economic levels of gold. A subsequent review found the gravity circuit that had been installed was not suited to processing the unique Cascavel gold mineralisation.
Late last year, Orinoco took a “back to basics” approach and installed a hammer mill to crush the ore into smaller particles to facilitate larger gold recoveries.
Since then, hammer mill trials have consistently generated high-grade gold.
During the June quarter, hammer mill three was commissioned, with Orinoco mining 3,781t to produce 219.53 ounces of gold.''
https://*********.com.au/orinoco-gold-recovers-bonanza-gold-cascavel/
DYOR
- Forums
- ASX - By Stock
- Rivers of Gold Production Drought
Bonanza Gold Run at Cascavel Continues etc.... ''Drilling...
-
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OGX (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online