ITC 0.00% 8.2¢ impress energy limited

Hi GS,My point is exactly that. Snatcher will open later,...

  1. 261 Posts.
    lightbulb Created with Sketch. 48
    Hi GS,
    My point is exactly that. Snatcher will open later, Growler earlier, and as a result drilling may commence sooner. Oil Production because of transporting of oil may be delayed, as road repairs are completed to withstand heavy trucking, but the drilling at Growler may be happening sooner than has been announced as the heavy equipment, the drilling rig, is all ready there.

    IMO DYOR
 
watchlist Created with Sketch. Add ITC (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.