Another google snippet from MINING.com on 23/3/2012-
referring to the auction and the expandabilty of the Cuprumin Abrud mine-
"Copper production began in 1983 and the designed capacity of the mine is 9 million tons of ore extracted and processed per year with expansion to 15 million tons per year."