There is plenty of time for the oppies. If PB3 flows at 5mmcfd or more they are a dead set certainty. A little less than that and you'll probably still be OK, but with a low flow rate you will be relying on reworking of PB1 and PB2 to get you over the line.
Certainly everything that needed to be done for PB3 has been done. Now we await the announcement confirming that things are still sweet. Confirmation of successful casing should see an increase of 1-2cps, I would think.
Cheers,
-Disco
- Forums
- ASX - By Stock
- rps energy estimate
There is plenty of time for the oppies. If PB3 flows at 5mmcfd...
-
-
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GDN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online