OSB, I think you missed my point: I was referring only to confirmation of successful casing.
Confirmation of flow rates and reserve estimate upgrades are another kettle of fish. Refer to my other post entitled "gdn valuation #2" to get an idea of where I think this might go based on these two events.
http://www.hotcopper.com.au/post_threadview.asp?fid=1&tid=1153383&msgno=5283035#5283035
Cheers,
-Disco
- Forums
- ASX - By Stock
- GDN
- rps energy estimate
rps energy estimate, page-6
-
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GDN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online