As foreshadowed in the last presentation, we've had a drop in production for february, with monthly production of 20864 barrels or 745 bopd, compared to 826 bopd in January.
They did mention in the presentation they had weather related problems (rain and floods) and operational problems with the new rigs.
As well as this only 98 barrels have been included from Groce, which I would imagine is the oil produced from testing the flowrate of the well. Once they get collection equipment up and going in Nash and Bolling, should get a boost in production.
In the meantime drilling on Nash and Bolling would be a bit of a drain on production with less drilling equipment available on Blue Ridge.
Looking forward to next quarter when they have these temporary setbacks sorted.
Add to My Watchlist
What is My Watchlist?