So glad they included this statement in the announcement released 7th April '14....immediately must have a different meaning in havelock-speak.
"Following setting the initial casing string at 1,246 feet, the Operator has installed flow testing tanks and a separator unit at the well head to have this equipment in place to be able to immediately test any potentially commercial carbonate zones as the well drills through the target carbonate sections. This will enable the Operator to immediately commence a commercial production testing program if a carbonate zone produces material flows to surface from drilling, and not waiting to test the zone until after the well has been drilled to its planned depth of 4,100 feet and test the deepest carbonate sections first"
- Forums
- ASX - By Stock
- ETR
- rrs chief reports encouraging production test
rrs chief reports encouraging production test, page-67
-
- There are more pages in this discussion • 104 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ETR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.88M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ETR (ASX) Chart |
Day chart unavailable
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online