Actually, looking again at Figure 2 in the 6 April Drill Intercepts at Manono announcement the shape described is almost as close to a rectangle as to a sector so I exaggerated a bit. Between M017DD001 and M018DD007 looks to be about 200 meters at the top. Maybe 300 meters at end of hole. Not quite a rectangle. - But that is six drill holes.
- Forums
- ASX - By Stock
- AVZ
- Running discussion on SP
Running discussion on SP, page-1303
-
- There are more pages in this discussion • 80,517 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
78.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.752B |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AVZ (ASX) Chart |
Day chart unavailable